Vantage Point
Critical Action Required
You have 1 project at risk of rejection due to binding constraints. The Valley-North 345kV corridor is the bottleneck for 3 projects.
System Status Summary
8 projects screened this cycle. 4 are feasible, 3 require conditional planning, 1 face blockers.
5 constraints identified as binding across the portfolio. The Valley-North 345kV corridor dominates feasibility outcomes for 3 projects.
4 required upgrades span transmission, substation, and control systems. Total portfolio upgrade investment exceeds $170M with dependencies across multiple projects.
Key Metrics
System Binding Constraints
| Constraint ID | Type | Contingency Trigger | Base Severity | Binding Likelihood | Status |
|---|---|---|---|---|---|
| L-123_SUB1 | Thermal | N-1 VN-Line1 | 92% | 87% | Action Required |
| V-456_CST2 | Voltage | N-2 Line1+Gen3 | 78% | 65% | Monitored |
| S-789_EZ04 | Stability | N-1 Cap1 | 65% | 52% | Monitored |
| T-234_NSB5 | Thermal | N-1 Transformer1 | 88% | 73% | Action Required |
| V-567_RSM3 | Stability | N-1 MainLine | 45% | 28% | Monitored |
Items Requiring Attention
PRJ-004: Gas-Fired Generation Delta
Escalation required — Feasibility constraint cannot be mitigated within acceptable cost-benefit threshold.
PRJ-003: Battery Storage Gamma
Conditional feasibility — Awaiting North Substation transformer upgrade schedule confirmation.